Thursday, February 6, 2025

Portfolio Project 3 Schedule

#3 Schedule

    My team and I have finished our schedule. I have it right down here:


    Had to make the images really big for any detail to show but I think it's pretty readable

    I'll briefly go over what we have planned for the project. For this week we are finishing brainstorming and deciding on one concrete idea. We're probably going to switch from drama to psychological horror, however both drama and comedy aren't off the table.
    For week three we will have some pre production stuff sorted out, mainly actors, storyboarding, and scripts.
    For week four we are developing on previous ideas, deciding the specifics of the mice-en-scene. We are also deciding in a viable date to film.
    For week five and six we will be filming and begin editing.
    For week seven and eight we will be editing. We wanna have close communication between the team so we can iron out our ideas and figure out everything.

    We want to better plan out how we are gonna make this since in every single project that at least I've ever worked on I have had issues from a lack of scheduling. It's always an actor canceling last second, or the whole video being messy from a lack of awareness about what the shots look. I really do want this to turn out good so to me this really does feel important.

No comments:

Post a Comment